An aerial view showing 85% of the track laid. The bit of track hanging over each end will be supported by some extra timber which will link to the 360deg 'whole train turntables' that will be built. I hope to share those with Cement Quay and junk the current cassettes which are an accident waiting to happen when turning an entire train.
An aerial view showing 85% of the track laid. The bit of track hanging over each end will be supported by some extra timber which will link to the 360deg 'whole train turntables' that will be built. I hope to share those with Cement Quay and junk the current cassettes which are an accident waiting to happen when turning an entire train.
25th November 2007 22:17
Catcott Burtle diary: June 07 - March 08
Model Railway Layouts by Chris Nevard @ fotopic.net
Taken using a Nikon NIKON D200
Looking towards Shapwick! All the visible rails are now down, just wiring, a few missing chairs and the cosmetic fishplates to add........ exit point will be hidden by some suitable trees eventually. Previous | NextUpdate 17 Nov 2007: The correct sash windows have now been made for the keeper's cottage using plastic glazing and self adhesive paper lables. The frames at this stage can be set in various open and closed positions!

Added on 28th November 2007, has been viewed 1513 times
(517 this year, 19 this month, 8 this week, 1 today)
 

All photographic images* on this website are © 1981-2009 Chris Nevard. This Web Site and any of its contents may not be copied, translated or distributed in any manner (electronic, web or printed) without the prior written consent of Chris Nevard. Contact. We actively seek out copyright violations in print and on the Internet and will use full legal force to deal with any Copyright infringements. * Photographic images are defined as GIF & JPEG format image files.